PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

backfilled and compacted around the sanitary and water service pipes Facing South (800x600).jpg Excavating for the underground sanitary sewer Facing East (800x600).jpg Installing metal decking at Steel arch Facing East (800x600).jpg Started installing the temporary stair Facing South (800x600).jpg Underground storm piping between column lines G-G.1 Facing North (800x600).jpg Gravel for Stair -5 pit Facing North (800x600).jpg Installed metal decking at Steel arch Facing East (800x600).jpg Placing 3-4 gravel insde Stair -5 pit Facing West (800x600).jpg